WORK — CASE STUDY · THE RETURN

BRANKOV

A 1960 landmark on Belgrade’s busiest corner — dark for twenty years, and leased again before the doors reopened.

BRANKOVA & CARICE MILICE, BELGRADE · 13 FLOORS · 10,500 M² · FOLIĆ ARCHITECTS · EDGE CERTIFIED

SCENE 01 — THE BUILDING

A building everyone
had walked past.

BRANKOV Business Center stands on the corner of Brankova and Carice Milice, on the rim of Zeleni Venac — thirteen floors of offices, 10,500 square metres, 8,300 of them leasable. None of it is new. Milica Šterić drew this building for Energoprojekt between 1956 and 1960, gave Belgrade one of its first modular metal-and-glass facades, and won the Seventh of July Award for it. Then it was a bank. Then it was empty for twenty years, in the middle of the city, in plain sight.

Folić Architects brought it back without tearing it down — the original concrete frame stayed, which is where most of the saved carbon lives. ColourFiction produced the visuals and the film for the leasing campaign, and flew the drone unit over a corner that never stops moving.

Aerial dusk view of Belgrade with the tower above Zeleni Venac
SC.01 — THE SITE · ZELENI VENAC FROM THE AIR
EXT. THE CORNER IN MOTION · FILM LOOP

ACT I

The Image

An office floorplate is a commodity. An address and a facade are not.

Tenants do not choose between floorplates — they choose between addresses. So the stills were built around what this building has and no new tower in Belgrade can buy: the corner itself, Šterić’s glass grid catching low light, and a terrace on the sixth floor that looks straight over the market to the whole city.

The interiors were staged the way the building would actually be used — someone stepping into the lift, two people at reception, a floor mid-morning. Empty rooms photograph badly and lease worse.

I / 01 — EXT. THE CORNER

Thirteen floors seen from the crossing, the crown against open sky, and the annex holding the boulevard.

The built tower crown against clear sky with a facade gondola in use
SC.03 — EXT. THE CROWN · GONDOLA ON THE FACADE

I / 02 — INT. THE ARRIVAL

The lobby carries the argument for sustainable material — so it had to be shown as a room people are already standing in.

I / 01 — THE CORNER & THE ARRIVAL

Street-level view of the tower from the crossing, pedestrians in motion
SC.02 — EXT. THE CROSSING
Full-height corner view of tower and annex from the boulevard
SC.04 — EXT. THE ANNEX
Reception hall with fluted timber wall and emerald lounge chairs
SC.06 — INT. THE TIMBER WALL
Lift core in warm oak and concrete, a man stepping into the cabin
SC.07 — INT. THE LIFT CORE
Reception desk with two people, warm timber wall and linear lighting
SC.05 — INT. RECEPTION
Lift lobby with signage and floor directory, two people talking
SC.08 — INT. LIFT LOBBY
Open-plan office with ring pendants and panoramic river view
SC.09 — INT. OFFICE FLOOR · RIVER SIDE

I / 03 — THE SIXTH FLOOR

The terrace is the building’s best argument, and the only one that cannot be copied by a newer address.

Sixth-floor green terrace at sunset, glass facade mirroring the city
SC.10 — EXT. THE TERRACE AT SUNSET
Tenants on the planted roof terrace, Belgrade skyline beyond
SC.11 — EXT. THE TERRACE, MID-MORNING
Corner executive office with dual city windows at dusk
SC.12 — INT. CORNER OFFICE AT DUSK

ACT II

The Motion

A corner this busy cannot be filmed as if it were empty.

Zeleni Venac is the loudest address in Belgrade — market, buses, the bridge ramp, all of it at once. Showing the building as an object on a clean sky would have been a lie the location itself corrects the moment anyone visits. So the studio flew the site and set the finished building into real drone plates: the same traffic, the same haze, the same afternoon. What reads as documentary footage is half photography, half render.

ACT II — THE DRONE UNIT

Real plates
over Zeleni Venac.

We flew the location ourselves. The plates gave the film its hardest shots — the building set back into its own street, with the market moving underneath and the river behind it.

The same survey gave the offices their views. What a tenant sees through the glass on the eleventh floor is not an artist’s impression of Belgrade. It is Belgrade, photographed from that height.

Aerial dusk view of Belgrade with the tower above Zeleni Venac
SC.13 — AERIAL PLATE · THE RIVER SIDE

FINAL CUT — WHAT WAS DELIVERED

ACT IEXTERIOR + INTERIOR VISUALS
ACT IILEASING FILM · DRONE CINEMATOGRAPHY
CREDITSARCHITECTURE — FOLIĆ ARCHITECTS · INVESTMENT — SF1 GROUP · MANAGEMENT — MPC PROPERTIES

THE RESULT

The ground floor opened with Starbucks, Delfi and Laguna, and the offices were close to fully let before the building reopened. Šterić’s building went back to work after twenty dark years — and the campaign that carried it ran entirely on frames of a building nobody could yet visit.

Still life detail: marble object and wooden bowls on the reception counter
SC.14 — INT. DETAIL · THE COUNTER

PROJECT IN THE PIPELINE?

Like what you see.

If you have a project that should launch like this, we would like to hear about it.

Start your fiction

Your building is still fiction.
Let’s change that.

Start your fiction